Worksheet pack: Project Cost Estimation
9 printable minibooks. Free with email signup.
"Calculate the Cost Before Signing, Not After the Work Has Started"
This worksheet pack contains 9 printable minibooks that operationalize the frameworks in the book. Use them in a working session, with your team, or with your accountant. The pack is free; the book is sold separately on Google Play for Rp 41,999.
Direct link to the compiled pack (no email required, but the email list helps us notify you about new books): op-18-project-cost-worksheets.pdf
Or download just one minibook
The pack splits into 9 minibooks. Each addresses one specific operator situation. Take only what you need — no email required for individual downloads.
01 / 9
WBS Quick-Build Sheet -- Two-Level Structure
high volume
02 / 9
Three-Point Estimate Sheet -- Per Component
high volume
03 / 9
Weekly Variation Order Log -- Active Project
high volume
04 / 9
Parametric Estimate for a Novel Project Type
niche search
05 / 9
Contingency Justification Memo -- Board or Investor Presentation
niche search
06 / 9
Post-Project Cost-Variance Retrospective
niche search
07 / 9
Client Requests 15% Scope Addition Mid-Project at Fixed Price
specific case
08 / 9
Subcontractor Bankruptcy Requiring Re-Estimation of Remaining Work
specific case
09 / 9
Tender Requires Bid Submission Within 72 Hours
specific case
high volume — the situation operators face every week
niche search — specific edge cases worth a separate worksheet
specific case — designed for one decision, one moment