355kw Submersible Pump Installation
Aetra Tangerang water intake facility.
| Parameter | Value |
|---|---|
| Client | Aetra Tangerang |
| Equipment | Submersible pump, 355kw |
| Location | Water intake facility, Tangerang |
| Scope | Full installation: rigging, alignment, commissioning |
Scope
Installation of a 355kw submersible pump at the intake facility for Aetra's water treatment operations in Tangerang. The pump handles raw water intake at high volume for municipal supply.
The installation required crane rigging in a confined space, precision alignment of the pump column, and connection to the existing piping network. The work was performed during night shift to minimize disruption to water supply operations.
What this required
- Site survey and clearance assessment for crane positioning
- Rigging plan for vertical lift into the intake well
- Electrical connection and motor testing
- Commissioning and performance verification
The pump has been in continuous operation since installation.