355kw submersible pump being lifted by crane at Aetra Tangerang, night shift
ParameterValue
ClientAetra Tangerang
EquipmentSubmersible pump, 355kw
LocationWater intake facility, Tangerang
ScopeFull installation: rigging, alignment, commissioning

Scope

Installation of a 355kw submersible pump at the intake facility for Aetra's water treatment operations in Tangerang. The pump handles raw water intake at high volume for municipal supply.

The installation required crane rigging in a confined space, precision alignment of the pump column, and connection to the existing piping network. The work was performed during night shift to minimize disruption to water supply operations.

What this required

The pump has been in continuous operation since installation.